After messuring with the colaboration of IES-UPM it was possible to determine a loss of installed power versus the expected 10.7 %. Thanks to that the owner was able to claim to the constructor the necessary module replacement without any extra expenses as well as the compensation for production losses during the works. aBalados considers this achievement as important as all parties involved accepted from the very beginning the measurements and their precission.
Power measurements at PV plant
- Home
- Power measurements at PV plant